• IM电竞体育

    A Digital Building Platform Service Provider

    Provides products and services covering the entire life cycle of buildings.

    01
    04
    bg-bg-left

    We use TAS, TRB, TBQ for this project. It takes about 1 month.Our feelings are as follows: 1. We build the TRB model first, then import to TAS; import BQ into TBQ, connect TAS & TRB with TBQ, link the quantity of the corresponding entity with the BQ item, and compare the contract BQ with the actual quantity quickly. Save us lots of time! 2.The structural drawings of this project use China's flat construction drawings, and the efficiency of TRB modeling is still high. The intuitive rebar 3D make us to check easily.

    Edwin Chen/Tan mi/Xuling

    Edwin Chen/Tan mi/Xuling

    Quantity Surveyor Giant Leap Construction

    Join Glodon at QSApex 2024 for Groundbreaking Insights into 5D BIM

    Join Glodon at QSApex 2024 for Groundbreaking Insights into 5D BIM

    Oct 05.2024 13:00-20:00   GMT + 8
    Offline
    Meet Glodon at UK Construction Week Birmingham 2023

    Meet Glodon at UK Construction Week Birmingham 2023

    Oct 04.2023 18:15-19:00   GMT + 8
    Offline